What is a task type code?
What is a task type code:
The unique JOYN task number follows the following pattern: Field Code-Task Type Code-####.
So for example if Colorado is the field, and we have a Plunger Replacement task that has been created for the 101st time, based on the setup of Field Code = CO and Task Type code = PLUNGR, it would be called: CO-PLUNGR-101